GENWiki

Premier IT Outsourcing and Support Services within the UK

User Tools

Site Tools


archive:humor:icm.hum
		     Another First for ICM

The Inoperable Computer Machines (ICM), which recently (MODERN DATA, April 1983) made headlines with its introduction of a truly third generation computer, has again illustrated its pioneering spirit by developing a radically new employee performance appraisal procedure. By reducing the appraisal process to a simple chart scheme, shown below, the ICM has enabled the manager to recognize quickly the strengths and weaknesses of his employees.

_ Performance Degrees _

Performance | Excellent Very Good Good Fair Unsatisfactory

Factors   | (1 in 15)     (3 in 15)	  (8 in 15)  (2 in 15)	(1 in 15)
    | Far Exceeds   Exceeds Job    Meets      Needs	Does Not Meet
    | Job Require-  Require-	   Job	      Improve-	Minimum
    | ments	    ments	   Require-   ment	Requirements
    |				   ments

_ Quality | Leaps tall Must take Can only Crashes Walks | buildings a runnung leap over into into | with a start to a short barns walls | single leap over garage | bound a house _

Timeliness | Faster As fast Slower Slower Dances

    | than a	     as a	   than a     than a	on
    | speeding	     speeding	  cannonball  freight	three
    | bullet	     bullet		      train	feet

_ Initiative | Stronger Stronger Stronger Shoots Has the | than a than a bull than a the aroma of | locomotive elephant bull bull a bull _

Adaptability| Walks on Walks on Swims Passes Needs

    | water	     water in	   in	      weak	a
    |		     emergencies   water      water	bath

_ Communica- | Talks Talks Talks Argues Loses tion | with with to with those Skills | God angels himself himself arguments _ 

/home/gen.uk/domains/wiki.gen.uk/public_html/data/pages/archive/humor/icm.hum.txt · Last modified: 1999/08/01 17:14 by 127.0.0.1

Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki